Planned engineering work will take place between Wigan North Western/Wigan Wallgate and Westhoughton/Daisy Hill from 00:20, Monday 06 May 2024 to 05:00, Tuesday 07 May 2024.
All lines will be blocked.
All services will be revised.
Monday
Liverpool Lime Street Wigan North Western Blackpool North: Trains will terminate at St Helens Central.
Blackpool North Wigan North Western Liverpool Lime Street: Trains will start from St Helens Central.
Southport Manchester Oxford Road (in both directions): Trains will not run.
Southport Stalybridge: Trains will run between Salford Crescent and Stalybridge. The Salford Crescent to Blackburn services will start back from Bolton to serve Moses Gate, Farnworth and Kearsley.
Stalybridge Southport: Trains will run between Stalybridge and Bolton.
Blackburn Headbolt Lane: Trains will run between Blackburn and Salford Crescent, and between Wigan and Headbolt Lane.
Headbolt Lane Blackburn: Trains will run between Headbolt Lane and Wigan and between Salford Crescent and Blackburn.
Leeds Wigan Wallgate: Trains will terminate at Manchester Victoria.
Wigan Wallgate Leeds: Trains will start from Manchester Victoria.
Buses will be provided between Buckshaw Parkway, Wigan and St Helens Central (in both directions), between Southport and Wigan (in both directions), between Wigan and Bolton (in both directions), and between Wigan and Salford Crescent via Atherton (in both directions).
Customer Advice:Normal journey times are extended by approximately 60 minutes. Please allow extra time for your journey.
Please check station information posters or online for the location of the bus pick up points.
For customers requiring mobility travel assistance please call us on 0800 138 5560 (Text Relay 18001 0800 138 5560).
Last Updated:29/04/2024 00:01